// Case Study · Commercial

9,600 sq ft Duro-Last PVC retrofit. Funded and finished in 6 weeks.

Anniston, AL · Built-up roof leaking everywhere, brand-new owner. We helped him secure financing, broke ground in under 30 days, finished install in 2 weeks. Tapered insulation for drainage, new perimeter gutters, 20-year NDL warranty.

Duro-Last PVC commercial roof installation in progress on 9,600 sq ft warehouse in Anniston, Alabama

9,600

Square Feet

2 wks

Install Time

20 yr

NDL Warranty

<30

Days to Break Ground

// The Problem

An old built-up roof. Leaking everywhere. A brand-new owner who knew it.

When the new owner took possession of 289 Summerall Gate Road in Anniston, the roof was already failing. Decades of weathering had stripped away the granules, the membrane was cracking, and water was finding its way in from every direction. He didn’t need a sales pitch. He needed a roof.

What he didn’t have was a clean path to financing on a building he’d just bought. That’s where most contractors would have walked away — or quoted the job and waited around. We didn’t.

Aerial view of weathered built-up roof before replacement, showing extensive granule loss and damage

// The Solution

Duro-Last PVC. Tapered insulation. New gutters. 20-year warranty.

Membrane

Duro-Last PVC

Custom-fabricated to the building’s exact dimensions before it ever got to the site. Fewer field seams. Fewer failure points.

Insulation

Tapered for drainage

Engineered slope across the entire deck so water actually moves to the new perimeter gutters instead of pooling.

Drainage

New perimeter gutters

Wrapped the entire building. Sized for Alabama’s heaviest storms. No more water sheeting off the eaves into the parking lot.

Warranty

20-year NDL

No Dollar Limit. Duro-Last covers labor, materials, and consequential damage — not just the membrane. The strongest paper in the industry.

// The Work

From financing to handshake in six weeks.

We sat down with the new owner the same week he closed on the building. Walked the roof together. Gave him a written scope, a fixed price, and the financing options that actually work for a freshly-purchased commercial property in Alabama. Within 30 days the deal was signed and the materials were on order. Two weeks later the roof was done.

Crew installing Duro-Last PVC membrane and tapered insulation on commercial roof

// The Result

A roof that’ll outlast the next owner.

Duro-Last PVC reflects 88% of the sun’s energy, so the building runs cooler in summer. The tapered insulation means no more ponding, no more standing water, no more leaks searching for a path inside. The 20-year NDL warranty means if anything goes wrong — labor, material, or consequential damage — it’s covered. Not just the membrane. The whole job.

Finished 9,600 sq ft white Duro-Last PVC commercial roof in Anniston, Alabama

// Project Gallery

Every angle of the job.

289 Summerall Gate roof project photo
289 Summerall Gate roof project photo
289 Summerall Gate roof project photo
289 Summerall Gate roof project photo
289 Summerall Gate roof project photo
289 Summerall Gate roof project photo

// Got A Roof Like This?

Old. Leaking. Or just past its prime?

Free roof inspection. Honest scope. Financing options that work for commercial property in Alabama and Georgia. Same conversation we had with the owner of 289 Summerall.